Residential EPCs

As built SAP Calculations and final EPC

An as built SAP calculation is the final stage of the building compliance process and is carried out once building work (and an air pressure test) has been completed.

Once your property has been built, Building Control require a final EPC, which is generated from an As built SAP Calculation.  The As built SAP is required because the majority of buildings during the course of construction will deviate slightly (or sometimes be completely redesigned!) from what the initial design stage SAP would have been based on.  Once the property is completed the results of the air test along with the as built build specification are entered back into the original design stage assessment to produce an accurate EPC for the property.

The As built SAP & EPC Process

Contact our team to let us know you are nearly / have completed >>>>>> we request an as built confirmation sheet, see example here>>>>>>>we assess the as built specification into the SAP software>>>>>>we confirm the required air test design figure and get the assessment to a point where its just awaiting the air test result>>>>>>carry out the air test>>>>>>EPC can be produced within 24hrs of air test completion>>>>>EPC, As built SAP and Air test certificate forwarded on.

Photographic Evidence

Please note that any new development that is on the current 2021 regulations will need to include photographic evidence as part of the as-built information, please click here for our guidance document on what this involves.

Part L 2021 As-built SAP Calculation;

Including;

- Support and guidance to complete the as-built SAP confirmation sheet we require.

- Telephone call to discuss confirmation sheet on request.

- Confirmation of Air pressure test target figure.

- Full Building Regulations England/Wales Part L Report (BREL / BRWL) for submission to Building Control to demonstrate the building complies at 'on construction' stage.

- 'On Construction'  Energy Performance Certificate registered with Gov't database.

- Standard 5-7 day turnaround with fast track options available.

- Direct line to assessor working on your project to ensure full support

Get in touch

Melin Energy Consultants

Swansea

01792 002085

Bristol

01172 356512

London

020 3725 8399

© Melin Consultants 2024 | All Rights Reserved | Website by w3designs.co.uk